Foundation

  • Excavation
  • Footings poured
  • Form and pour walls
  • Damp proofing
  • Foam insulation
  • Inspection
  • Backfill

Framing

  • First floor
  • Second floor
  • Roof trusses
  • Roof sheathing

Roofing

  • Felt or paper
  • Valley flashing
  • Shingles

Exterior

  • Exterior Trim
    • Fascia
    • Windows and doors
    • Sheathing
    • Finish materials
    • Deck, if applicable
    • Gutters
  • Exterior painting
  • Concrete or asphalt
  • Find grading
  • Lanscaping, if applicable

Interior

  • Rough-in mechanical systems
    • HVAC (heating, ventilating, and air conditioning)
    • Plumbing
    • Electrical (extra outlets need to be installed at this point) Insulation
  • Insulation
    • Inspection
  • Drywall
    • Hang, tape, finish, texture, prime and paint
  • Interior trim
    • Doors
    • Baseboards, casing, other details
  • Paint and stain

Heading

  • Cabinets and countertops
  • Tile
  • Floor coverings
  • Appliances
  • Hardware
  • Light fixtures
  • Plumbing fixtures

Construction Cleaning

Builder's Punch-List

Homeowners Orientation

Closing

Home Maintenance Service

Signature Homes Utilizes "Critical Path Method" of scheduling to insure thecompletion of your home is as close to the estimated date as possible. We have a chart of your home in our office which is updated daily. If you would like to checkon the status of your home, please feel free to contact or stop in our office.

See our work